Home/Electric Cars & SUVs/Avatr 06T/Charging

CHANGAN Auto

2026 Avatr 06T: Charging

U.S. charging estimate

Charge Avatr 06T

Estimate how long it may take to charge Avatr 06T and how much energy the session uses. Adjust the starting and target battery levels, charging speed and electricity rate to see how those choices affect time and cost.

72.9 kWhUsable battery
11 kW ACVehicle limit
150 kW DCVehicle limit
J1772 charging connectorJ1772 / CCS1Compatible connectors
1. Where are you charging?

2. Set your charging session

EIA residential average, May 2026. Public fast-charging prices vary by network; enter the displayed station price for a closer estimate.

Estimated session cost$8.96

48.6 kWh drawn from the grid

Time6 hr 20 min
Added to battery43.7 kWh
Average limit7.7 kW
Cost / 100 mi$3.70
Range added≈ 242 mi

Limited to 11 kW by the vehicle

MOTORWATT