Home/Electric Cars & SUVs/Changan Nevo A06 /Charging

CHANGAN Auto

2026 Changan Nevo A06: Charging

U.S. charging estimate

Charge Changan Nevo A06

Estimate how long it may take to charge Changan Nevo A06 and how much energy the session uses. Adjust the starting and target battery levels, charging speed and electricity rate to see how those choices affect time and cost.

51.5 kWhUsable battery
11 kW ACVehicle limit
150 kW DCVehicle limit
J1772 charging connectorJ1772 / CCS1Compatible connectors
1. Where are you charging?

2. Set your charging session

EIA residential average, May 2026. Public fast-charging prices vary by network; enter the displayed station price for a closer estimate.

Estimated session cost$6.33

34.3 kWh drawn from the grid

Time4 hr 28 min
Added to battery30.9 kWh
Average limit7.7 kW
Cost / 100 mi$3.33
Range added≈ 190 mi

Limited to 11 kW by the vehicle

MOTORWATT