Home/Electric Cars & SUVs/Rivian R2/Charging

RIVIAN

2026 Rivian R2: Charging

U.S. charging estimate

Charge Rivian R2

Estimate how long it may take to charge Rivian R2 and how much energy the session uses. Adjust the starting and target battery levels, charging speed and electricity rate to see how those choices affect time and cost.

94 kWhUsable battery
11 kW ACVehicle limit
150 kW DCVehicle limit
J1772 charging connectorJ1772 / CCS1Compatible connectors
1. Where are you charging?

2. Set your charging session

EIA residential average, May 2026. Public fast-charging prices vary by network; enter the displayed station price for a closer estimate.

Estimated session cost$11.56

62.7 kWh drawn from the grid

Time8 hr 10 min
Added to battery56.4 kWh
Average limit7.7 kW
Cost / 100 mi$6.42
Range added≈ 180 mi

Limited to 11 kW by the vehicle

MOTORWATT