U.S. charging estimate
Charge GENESIS GV60 Electrified
Estimate how long it may take to charge GENESIS GV60 Electrified and how much energy the session uses. Adjust the starting and target battery levels, charging speed and electricity rate to see how those choices affect time and cost.
80 kWhUsable battery
11 kW ACVehicle limit
150 kW DCVehicle limit
2. Set your charging session
EIA residential average, May 2026. Public fast-charging prices vary by network; enter the displayed station price for a closer estimate.
53.3 kWh drawn from the grid
Time6 hr 57 min
Added to battery48 kWh
Average limit7.7 kW
Cost / 100 mi$5.11
Range added≈ 193 mi
Limited to 11 kW by the vehicle









